Mistakes made before design
- Buying a plan before checking what the lot allows
- Assuming a garage is convertible without checking ceiling height and slab
- Skipping a survey and discovering an easement during plan check
- Not verifying electrical service and sewer capacity
- Choosing a contractor before the scope is defined
Mistakes made during design
- Designing the unit without deciding how it will be used
- Ignoring afternoon sun and privacy from the neighbour's windows
- Under-planning storage in a small footprint
- Leaving finishes undecided until after framing
- Changing the design after the first plan-check submittal
Mistakes made during construction
The pattern is consistent: decisions made late cost more than decisions made early. A written scope, a selection schedule and a change-order process prevent most of it.
- Approving verbal changes without a written price
- Missing inspection windows and holding up the next trade
- Deferring selections until the item is about to be installed
- Not protecting finished surfaces and landscaping during site work
- Treating the punch list as optional
This article is general information for Los Angeles County homeowners, not legal or engineering advice. Requirements change; confirm current rules with the reviewing agency and the official sources referenced in this site's permits guide.