Skip to content
Design & planning

ADU Design-Build Services in Los Angeles

Feasibility, drawings, engineering, permits and construction coordinated by one team — so the design that gets approved is the design that gets built.

Starts with
Property feasibility
Includes
Design, engineering, permits
Delivered as
One coordinated scope

What design-build actually means

In a traditional arrangement, you hire a designer, then bid the drawings to contractors, then discover what the design really costs. Design-build puts the design and the construction under one agreement, so the people drawing the unit are accountable for building it.

For an ADU, that matters because so many decisions are site decisions: where the unit can sit, how it connects to utilities, how crews reach the rear yard. Those are construction questions that should be answered during design, not after.

Feasibility comes before drawings

Before a design fee is committed, we review the property. The goal is to know whether the project you want is the project the lot allows.

  • Zoning, setbacks, coverage, height and floor-area limits
  • Access, parking, easements and existing structures
  • Slope, drainage, trees and soil considerations
  • Electrical service, water, sewer or septic capacity
  • Any historic, hillside or fire-hazard overlay that adds review

Design and documentation

Once feasibility is settled, we develop the unit around how it will be used and what the site allows.

  • Schematic plans, elevations and a furniture-level layout
  • Structural design coordinated with a licensed engineer
  • Energy compliance and Title 24 documentation
  • A permit-ready set that reflects the reviewing agency's requirements
  • Material and finish selections, with allowances stated in the scope
  • A construction sequence and schedule tied to the approved drawings

One contract, one point of responsibility

Design-build removes the gap where a designer blames the builder and the builder blames the drawings. If a detail does not work in the field, the same team resolves it and prices any change before it is built.

It also keeps the approved scope and the built scope aligned. The drawings you approve are the drawings the crew builds from, and the estimate you sign is tied to that set.

What you receive

  • A written feasibility summary for your property
  • Design drawings and a permit-ready submittal set
  • A line-item scope with allowances and exclusions
  • A construction schedule with the major milestones
  • Inspection coordination and a final walkthrough
  • Closeout documentation for the permitted work
Questions

Answers specific to this work.

Next step

Tell us about the property. We will tell you what is possible.

Share your address, the type of ADU you have in mind and your timing. We will follow up to review feasibility and the path to a written scope.

Request Your ADU Consultation (424) 572-5722

Los Angeles and Fontana offices · Monday to Friday

Call NowGet Estimate