Skip to content
How we work

Our ADU Construction Process

Six stages, one project lead, and a written scope before a written price. Here is what happens, in order, and what you receive at each step.

Stages
Six, from feasibility to handover
Contact
One project lead throughout
Changes
Priced before work begins

What happens at each stage

The six steps below are the sequence we follow on every ADU. What changes between projects is how long each stage takes and how much documentation the reviewing agency requires.

  • Initial consultation — We talk through your goals, how you want to use the space, your budget range and your timing.
  • Property and feasibility review — We look at the lot, setbacks, access, existing structures and utilities to establish what is realistically possible.
  • Design and planning — Drawings, engineering and material selections are developed into a scope you can review and price.
  • Permit coordination — We prepare and submit the application and respond to plan-check comments from the reviewing agency.
  • ADU construction — Foundation, framing, utilities, envelope and finishes, sequenced on a schedule with regular site communication.
  • Final inspections and handover — Inspections are closed out, the punch list is completed, and we walk the finished unit with you.

How we keep costs from moving unexpectedly

Unexpected cost is the concern homeowners raise most often, and it is a fair one. Construction involves conditions that cannot always be seen until work begins. The answer is not to promise that nothing will change; it is to make change visible, priced and approved before it happens.

  • A written scope that states inclusions, exclusions and allowances
  • A site review that opens what can be opened before pricing
  • A clearly identified contingency for concealed conditions
  • Change orders priced and signed before the work is performed
  • Selections scheduled early so allowances are replaced by real numbers
  • Weekly reporting on completed work and upcoming decisions

Communication while work is underway

You will have one project lead who knows your job. Expect a weekly update on progress, the next two weeks of work, any decisions needed from you and any item that could affect schedule or cost.

Questions between updates go to the same person. The point is that you are never guessing what is happening at your own property.

Most of our ADU clients are planning their first major construction project. We do not assume you already know the sequence: we explain what happens next, what it depends on, and which decisions are yours to make.

Inspections and handover

Inspections are scheduled at each required stage. A failed inspection is corrected before work continues, and we tell you what was corrected rather than handling it silently.

At handover we complete the punch list, walk the unit with you, and provide the closeout documentation for the permitted work. Any remaining warranty items are documented in writing.

What can change the schedule

  • Plan-check correction cycles at the reviewing agency
  • Utility coordination, including panel upgrades and sewer work
  • Weather, especially on open framing or exterior finishes
  • Owner selections that arrive after the allowance deadline
  • Concealed conditions that require a design revision
  • Inspection availability during peak periods
Questions

Answers specific to this work.

Next step

Tell us about the property. We will tell you what is possible.

Share your address, the type of ADU you have in mind and your timing. We will follow up to review feasibility and the path to a written scope.

Request Your ADU Consultation (424) 572-5722

Los Angeles and Fontana offices · Monday to Friday

Call NowGet Estimate