ADU Permits & Planning in Los Angeles

State law sets the baseline. Your city decides the details. We prepare the submittal, answer plan check and coordinate inspections so the process moves instead of stalling.

Reviews
LADBS or your city
Includes
Submittal, plan check, inspections
Guidance
General information, not legal advice

Official resources

Regulatory details should always be confirmed against the current published sources.

The state framework, then the city

California law establishes the baseline right to build ADUs and limits how cities can restrict them. Each city then applies its own ordinance, development standards and submittal process on top of that baseline.

In practical terms, that means two questions: what does state law allow, and what does the agency reviewing your address require? Both need answering before a design is finalized.

This page is general information, not legal advice. Requirements change, and the reviewing agency's current rules govern your application.

Who reviews your application

Most properties in the City of Los Angeles are reviewed by the Los Angeles Department of Building and Safety. Properties in Beverly Hills, Santa Monica, Pasadena, Glendale, Burbank, Calabasas, Hidden Hills, Agoura Hills, Westlake Village and Thousand Oaks are reviewed by their own city departments.

Some parcels in the Conejo Valley sit in unincorporated county territory, where the county is the reviewing agency. We confirm jurisdiction before preparing a submittal, because submitting to the wrong agency wastes months.

What a complete ADU submittal includes

  • Site plan showing the ADU, setbacks, coverage and existing structures
  • Floor plans, elevations and a roof plan
  • Structural calculations and details where required
  • Energy compliance documentation
  • Electrical, plumbing and mechanical plans
  • Grading and drainage plans on sloped or graded sites
  • Title 24 and, where applicable, fire-hazard documentation
  • Owner and contractor information, fees and forms

Plan check, corrections and inspections

Plan check is where most schedules are won or lost. A complete first submittal receives fewer correction letters; a correction letter restarts a review cycle. We prepare the set to the agency's checklist and respond to comments directly.

Once permitted, work is inspected in stages: foundation, framing, rough electrical, plumbing and mechanical, insulation, and final. Inspections are not a formality — a failed inspection stops work until the item is corrected.

Fees and what they cover

Permit and plan-check fees are set by the agency. Depending on the project and the jurisdiction, other fees may apply, including school fees and impact fees where the unit is not exempt under state law.

We identify the fees we know about in the estimate and flag the ones that can only be confirmed at submittal, so they are visible before they appear on a bill.

Common reasons ADU permits stall

  • Submitting to the wrong agency or the wrong review track
  • An incomplete set missing structural or energy documentation
  • Setbacks or coverage calculated from an outdated survey
  • Utility capacity not verified before design
  • Design changes made after the first submittal
  • Owner decisions delayed on scope or finishes during plan check
Questions

Answers specific to this work.

Next step

Tell us about the property. We will tell you what is possible.

Share your address, the type of ADU you have in mind and your timing. We will follow up to review feasibility and the path to a written scope.

Request Your ADU Consultation (424) 572-5722

Los Angeles and Fontana offices · Monday to Friday

Call NowGet Estimate