The stages
These are ranges, not promises. A hillside lot, a utility upgrade or a historic overlay can change any of them.
- Feasibility: roughly one to three weeks, depending on survey and utility information
- Schematic design: several weeks once the site is understood
- Engineering and permit set: several weeks, tied to selections and structural scope
- Plan review: set by the agency and the completeness of the submittal
- Construction: commonly four to eight months for a typical ADU
- Inspections and closeout: integrated into construction, plus the final walkthrough
What actually causes delay
- Correction letters that require a design revision
- Owner selections made after the allowance deadline
- Utility coordination, especially panel and sewer work
- Inspection availability during busy periods
- Weather on open framing or exterior finishes
- Concealed conditions discovered during demolition
How to keep a project on schedule
Decide early, in the order the schedule requires. Keep one decision log. Ask for a written schedule with milestones and a weekly update against it. When something slips, ask what it affects — not just when it will be done.