The drivers, in rough order of impact
Size comes first, because it multiplies framing, finishes, mechanical equipment and inspection scope. Type comes next: a detached unit needs its own foundation, roof and utility runs, while a conversion reuses a shell.
Then come the site-specific items: access, foundation conditions, electrical service, sewer capacity and the amount of structural work the existing house needs to accept the new unit.
- Square footage and ceiling height
- Detached, attached, conversion or junior ADU
- Site access and staging
- Foundation, grading and structural work
- Electrical service, panel and utility runs
- Finish level and selections
- Engineering, plan check and permit fees
Why two bids for the same drawings differ
Bids differ because scopes differ. One proposal may exclude permits, engineering, utility coordination or site protection; another may include them. One may carry a small contingency and a long allowance list; another may carry neither and rely on change orders later.
Compare line by line, and ask what happens when an allowance is exceeded. The answer tells you more than the total.
Keeping the budget where you set it
Make selections early, in the order the schedule requires. A finish chosen after the wall is closed costs more than the same finish chosen before framing.
Ask for changes to be priced in writing before work proceeds, and keep a single decision log so nobody is working from an old version of the plan.